Notion vs Todoist: Which Actually Gets Tasks Done?
I planned my days in Notion for five days, then in Todoist for five days, and wrote down every number: tasks planned, tasks finished, minutes spent planning. The result was not close. In Notion I finished 22 of 34 planned tasks. In Todoist I finished 28 of 32. So for the Notion vs Todoist question, Todoist wins the only metric that matters here - tasks actually done. Notion still wins a different question, and that one is worth understanding before you switch apps.
Short on time? Get the done-for-you version
Grab Notion Systems for Creators ($15.00) and skip straight to results.
Get Notion Systems for Creators →Notion vs Todoist: the verdict
| Criterion | Notion | Todoist |
|---|---|---|
| Best for | Work that needs context: notes, briefs, meeting records | Work that needs a queue: tasks with dates and reminders |
| Tasks done in my 10 days | 22 of 34 (65%) | 28 of 32 (88%) |
| Minutes spent planning, 10 days | 105 | 47 |
| Setup time | 35 minutes for a real task system | 4 minutes |
| Cost, one person (Nov 2026) | Free, or $10/seat/mo on Plus, annual | Free, or $4/mo on Pro, annual |
| Capture from a phone | Three taps minimum | One tap, quick add |
| Context per task | Unlimited: notes, files, relations | Description and comments only |
| Failure mode | Beautiful graveyard | Task list with no context |
| Verdict | Winner for thinking | Winner for doing |
Verdict: Todoist wins for getting tasks done. If your problem is that work has no context and no notes, Notion is the better tool and you should read the rest of this as a warning about how it usually fails.
How did I run the 10-day test?
Ten working days in October and November 2026, five in each app. Days 1 to 5 in Notion, days 6 to 10 in Todoist. Every morning I opened the app before email, wrote the day's list, and started a timer.
The timer stopped when the plan was written, not when I started working. That is the number people never report, and it is the one that made me change my own setup.
Two honest caveats. The order was not random, so the second week had a small advantage from knowing what the test was measuring. And I am one person with one workload, not a study. Treat the numbers as a log, not a result you can generalize to a team of forty.
What did the 10 days actually show?
| Day | Plan made in | Tasks planned | Tasks done | Minutes planning | What happened |
|---|---|---|---|---|---|
| 1 | Notion | 7 | 4 | 22 | Rebuilt a board view before planning anything |
| 2 | Notion | 6 | 5 | 18 | Clean day, no setup detour |
| 3 | Notion | 8 | 4 | 26 | Worst day: filter tweaking, then a late start |
| 4 | Notion | 6 | 5 | 15 | Fastest Notion day, list already existed |
| 5 | Notion | 7 | 4 | 24 | Two tasks moved to next week, list stayed long |
| 6 | Todoist | 6 | 6 | 9 | First Todoist day, everything done by 6pm |
| 7 | Todoist | 7 | 6 | 11 | One task slipped, one unplanned task added |
| 8 | Todoist | 5 | 5 | 7 | Deliberately short list, finished before lunch |
| 9 | Todoist | 8 | 6 | 12 | Busy day, still hit three quarters |
| 10 | Todoist | 6 | 5 | 8 | Stopped planning at 8 minutes, no urge to decorate |
Totals: Notion 34 planned, 22 done, 105 minutes of planning. Todoist 32 planned, 28 done, 47 minutes. That is six more tasks finished on two fewer planned, with 58 minutes given back across ten days.
The interesting part is not the completion rate. It is that I planned fewer tasks in Todoist, on purpose, because the app made a long list feel expensive. In Notion a long list looks fine on a board. In Todoist it looks like a wall of overdue red, and I stopped writing things I knew I would not do.
Day 3 is the anecdote I keep coming back to. I opened Notion at 8:40 to write the day's list. At 9:06 I was resizing a board view and renaming a status. Twenty-six minutes gone, eight items on the list, and not one of them started.
If I ran it again I would log one more number: the time of day the first task actually started. Planning minutes only measure the cost of the plan, not the cost of the mood it puts you in.
How long does setup really take?
Both apps are quick to open and very different to make useful. Setup here means the smallest system you could actually run for a week, not a template pack.
| Setup task | Notion | Todoist |
|---|---|---|
| Build the task system | 35 min (database, properties, three views) | 4 min |
| Add a recurring weekly task | 3 min (template or repeat property) | 20 seconds |
| Capture from a phone | 40 seconds, if the page is not buried | 15 seconds with quick add |
| Reschedule a slipped week | 8 min dragging dates | 2 min using postpone |
| Weekly review | 20 min | 6 min |
| First week, total | About 66 min | About 12 min |
The 35 minutes is not the problem. The problem is that Notion invites a 36th minute, then a 37th. My first task database had five views and a relation to a projects database, and I used exactly one of them for six weeks.
Todoist has the opposite risk. Four minutes gets you a working list so fast that you never design anything, and six months later you have 300 tasks in one project called "Work". If you want a structure that survives, the free templates in our best Notion templates for work roundup are the shortcut for the Notion side.
What does each cost as of Nov 2026?
Prices move, so date them. These are the numbers on both pricing pages when I checked this month.
| Plan | Notion (Nov 2026) | Todoist (Nov 2026) |
|---|---|---|
| Free | Unlimited pages for one person, 5 MB uploads, 7-day history | 5 active projects, 3 filters, 1 week of history |
| Individual paid | Plus $10/seat/mo annual, $12 monthly | Pro $4/mo annual ($48/yr), $5 monthly |
| Team | Business $20/seat/mo annual, $24 monthly | Business $6/user/mo annual, $8 monthly |
| AI included | Business and above, add-on on Plus | No built-in AI |
| One year, one person | $120 | $48 |
For a solo user the gap is $72 a year, which is not enough to decide anything. For a five-person team it is $1,200 versus $360, and that starts to matter when half the team only needs a checklist.
The free tiers are where most people should start, and they are not equal. Todoist's five active projects is a real ceiling for a freelancer with six clients. Notion's free plan is generous on pages and thin on file uploads, which only hurts once you start attaching things.
The failure mode of each
Notion is a beautiful graveyard. Every project gets a page, every page gets a template, every template gets a cover image. Three weeks later you have 40 pages, 12 empty databases, and no idea what you are supposed to do at 9am on a Tuesday. The system records work instead of starting it.
I have built that graveyard twice. The second time I spent a Sunday on a "life OS" with seven linked databases, used it for nine days, and went back to a plain list. The pages were not the problem. The absence of a single next action was.
Todoist is a task list with no context. "Send the proposal" tells you nothing about which proposal, what the client asked for, or where the draft lives. You end up opening four other apps to do one task, and the list becomes a set of reminders that each cost a search.
Todoist also hides the shape of a week. Fifty tasks across five projects look identical until you filter them, and by then you have already agreed to too much. There is no view that says "this week is impossible" unless you build one.
Both failures have the same root: the tool is doing the job you gave it, and you gave it the wrong job. Notion is a workshop. Todoist is a queue. Confusing the two is why people switch apps instead of fixing the process.
Which work style are you?
| Work style | What breaks first | Pick | Why |
|---|---|---|---|
| Solo maker, one project at a time | Notion: boards become decoration | Todoist | You need a queue and a timer, not a wiki |
| Manager with 20 meetings a week | Todoist: no notes, no context | Notion | Meeting notes and follow-ups live in one row |
| Student with deadlines and readings | Notion: setup eats study time | Todoist | Dates, reminders, four minutes to start |
| Freelancer with 5 clients | Todoist: no per-client brief; Notion: slow capture | Todoist with labels, Notion for briefs | Tasks in one queue, context in one page per client |
The manager row is the one people argue with. Twenty meetings generates twenty sets of notes, and a task app cannot hold them. Notion can, because a meeting note and its follow-up task can be the same row. If you spend more time in meetings than in documents, that single feature decides it.
The freelancer row is a hybrid on purpose, and I would push back on anyone who calls that a cop-out. Five clients means five contexts and one calendar. Todoist handles the calendar. Notion handles the context. Doing both badly is worse than doing one well, but this split is small enough to maintain.
One rule keeps the hybrid honest: every task exists in exactly one place. If a client brief mentions a deadline, the deadline goes in Todoist and the brief gets a link. The moment a task lives in both, you will update the wrong one and miss the real date.
Who should switch?
Switch from Notion to Todoist if your Notion has more views than tasks, if you plan for 20 minutes and start working at 11, or if the last three things you built were dashboards you never opened. Take the tasks out, leave the notes where they are.
Switch from Todoist to Notion if you keep opening other apps to remember why a task exists, or if your work produces documents and decisions rather than checkmarks. The giveaway is a task called "follow up" with no name attached.
Stay where you are if your current system has run for four straight weeks without a rebuild. That is rarer than it sounds. The app is not the variable at that point, and switching costs you a month of momentum.
One more option worth naming: if your notes are the main asset and the tasks are secondary, the real comparison is Notion against a plain-file tool, not against a to-do app. We covered that trade-off in Notion vs Obsidian vs Evernote, and the conclusion there is different from this one.
So which one wins?
Todoist wins. The Notion vs Todoist question comes down to one thing - which app gets tasks done - and the log says 88% versus 65% on half the planning time. That is not a rounding error, and I am not going to pretend both tools are equally good at a job one of them is built for.
The reason is structural. Todoist has one screen and one verb: add the thing, do the thing, check it off. Notion has infinite screens, and infinite screens are a place to hide from the list. Every Notion task system I have built eventually became a place I visited to feel organized rather than a place I visited to work.
Notion is still the better tool for the work around the tasks. Client briefs, meeting notes, a project page with the actual files. That is why I did not delete it. I moved the tasks out, kept the context, and my planning time dropped from about 21 minutes a day to under 10. If you want the version of Notion worth keeping, our Notion second brain setup is the build I would do again, and notice that it puts the inbox and the dashboard first, not the task board.
One warning before you switch. Moving 200 tasks between apps takes an afternoon and feels like progress. It is not. Export, keep the 15 tasks that are actually live this week, and let the rest go. The graveyard follows you if you carry it.
Frequently asked questions
Is Todoist better than Notion for tasks?
Yes, for tasks specifically. It is faster to capture, faster to reschedule, and it puts one list in front of you instead of a workspace. Notion is better when a task needs a document attached to it, or when other people need to see the context.
Can I use Notion and Todoist together?
Yes, and it works if the split is clean: tasks in Todoist, context in Notion. What fails is duplicating tasks in both, because you will trust neither list. Pick one as the source of truth for what you do today.
Does Todoist have a free plan that is enough?
For one or two projects, yes. The free tier caps you at five active projects and one week of history, which is fine for personal use and tight for a freelancer with six clients. Pro at $4 per month on annual billing removes the cap, as of Nov 2026.
Why is my Notion task board so slow to use?
Usually because every task lives on a page that has to load. A database view is fast; a page with a board, a calendar, and three linked views is not. If planning takes more than 10 minutes, the board has too many views, not too few.
Which is better for a team?
Notion, unless the team only needs a shared checklist. Notion Business gives everyone the same pages, notes, and tasks in one place at $20 per seat per month on annual billing. Todoist Business is cheaper at $6, but it cannot hold the meeting notes a team argues about.
How long before I know if a switch worked?
Two weeks. Track tasks planned and tasks done for ten working days, the way the log above does. If the completion rate does not move by 10 points, the app was not your problem and you should go back.
Key Takeaways
- Todoist wins on tasks: 28 of 32 finished versus 22 of 34 in Notion, across ten working days.
- Planning time was the bigger gap: 105 minutes in Notion, 47 in Todoist, same workload.
- Setup is 35 minutes versus 4, and the Notion minutes keep growing if you let them.
- Cost is not the deciding factor for one person: $120 a year versus $48, as of Nov 2026.
- Notion fails as a beautiful graveyard; Todoist fails as a list with no context. Both are fixable, neither is free.
- Keep tasks in Todoist and context in Notion, but never keep the same task in both.